Orlando Police Headquarters

Location

Orlando Florida

Scope of Work

Complete demolition of the 9 story 250,000 square foot Orlando Police Headquaters building. This building was a “bomb” shelter and was constructed with a concrete waffle deck slab / roof and the main elevator and stairwell core was cast inplace concrete. Our crew used a high reach excavator to surgicaly demolish the building very efficently and managed the dust to prevent the new Amway Arena from any silica issues.

Customer

Balfour Beatty Construction

Read more

Orlando Regional Hospital

Location

Orlando Florida

Scope of Work

Demolition and removal of a six story 300,000 SF parking garage structure. This parking garage was located in between two active hospital structures that remained open. All demolition activities had to be planned in advance so we wouldn’t disrupt the patients or doctors. Pece Of Mind used its Ultra-High excavator to demolish the structure in 5 days.

Customer

Jack Jennings & Sons

Read more

Alachua General Hospital

Location

Gainesville, Fl

Scope of Work

Demolition and removal of two nine story hospital buildings as well as demolition and backfill of the basement and tunnel system located under the structures. Pece Of Mind was also contracted to make some modifications to the storm water drainage piping and asphalt parking lots. The unique location of these buildings allowed for a basement to be built underneath the hospital, once the demolition was complete Pece Of Mind crushed 20,000 tons of the concrete waste and imported 40,000 CY of clean fill into the site.

Customer

Shands Health Care

Read more

University Centre Hotel & Parking Garage

Location

Gainesville, Fl

Scope of Work

Complete demolition of a 12 story Hotel and 4 story parking garage in Gainesville, FL. to make way for a new Cancer Hospital. The unique construction of the hotel along with its close proximity to Archer Road and location between an existing nursing home as well as Shands Hospital across the street made for a complex demolition project. Our Ultra High Excavator was used to demolish the parking garage and our 100 ton Manitowoc Crane to demolished the hotel. Dust control and a safe, careful demolition of both structures were of great concern to the owner and GC of this project. A Dust Boss was used for dust suppression as working heights exceeded 110’.

Customer

Shands Health Care