PROJECT 942
Complete demolition of the largest steel rollercoaster in Orlando and all systems located in the ride envelope. The steel coaster was 120′ tall, an...
See More
FREEDOM PLAZA
Complete demolition of a 12-story office building two blocks from the White House. The building was 200,000 square footage and surrounded by 3-stor...
See More
DISNEY SPRINGS
Complete demolition of 20 buildings located in the former “Down Town Disney” area to make way for the new “Disney Springs” entertainment district. ...
See More
ORBITER PROCESSING FACILITIES
Complete demolition of all 3 space shuttle hangers that were 90′ tall and covered a total of 150,000 square feet. This was a very complex project s...
See More
DISNEY HOLLYWOOD STUDIOS
Complete demolition of almost 1/3 of this historic theme park. The scope covered approximately 25 buildings totaling 600,000 square feet of buildin...
See More
DELTA HOTEL ABATEMENT & DEMOLITION
Complete demolition of the former Delta Resort in Orlando, FL, consisting of over 450,000 square feet of buildings, 3 large swimming pools, and a m...
See More
BERKMAN
We placed explosives throughout the building to remove supports. Then we completed the demolition with a high reach excavator. There were several b...
See More
TIMES UNION
This project included the main office building as well as a 3-story masonry production plant and several support buildings. We had to restore the s...
See More
Orlando Police Headquarters
Complete demolition of the 9 story 250,000 square foot Orlando Police Headquaters building. This building was a “bomb” shelter and was constructed ...
See More
Orlando Regional Hospital
Demolition and removal of a six story 300,000 SF parking garage structure. This parking garage was located in between two active hospital structure...
See More
Alachua General Hospital
Demolition and removal of two nine story hospital buildings as well as demolition and backfill of the basement and tunnel system located under the ...
See More
University Centre Hotel & Parking Garage
Complete demolition of a 12 story Hotel and 4 story parking garage in Gainesville, FL. to make way for a new Cancer Hospital. The unique constructi...
See More
Treasure Island
Complete demolition of resort that was damaged in hurricanes in 2004. We were able to safely demolish the structure in only six weeks.
See More
Best Western Hotel
We demolished an 18-story exterior concrete staircase without damaging the building.
See More
UNIVERSITY OF FLORIDA STEPHEN O’CONNELL STADIUM
Complete interior structural demolition of the stadium to make way for the new club-level suites and concession areas. The total work area was 350,...
See More
BP370
Complete Interior demolition of the Orlando International Airport Airside B. This project consisted of removing all existing finishes, MEP’s and wa...
See More
HYATT REGENCY GRAND CYPRESS
Mold remediation and interior demolition of 820 guest rooms. All of the interior drywall that was mold impacted was removed under full containment,...
See More
LUCERNE PAVILION HOSPITAL
Complete demolition of a 5-story 350,000 square foot hospital located in the heart of downtown Orlando. Our scope also included complete asbestos a...
See More
WASHINGTON SHORES
Complete demolition of an entire public housing community. The total square footage of all the buildings was 300,000 square feet. Our asbestos abat...
See More
WINTER HAVEN HOSPITAL
Asbestos abatement of friable asbestos fireproofing on 3 active hospital floors. This project was required to facilitate a major renovation project...
See More
Vertical Assembly Building (VAB)
Removal of hazardous paints and coatings, including PCB’s and Inorganic Zinc from the entire High Bay 3 inside the VAB. Our team designed and devel...
See More
BP370
Complete Interior demolition of the Orlando International Airport Airside B. This project consisted of removing all existing finishes, MEP’s and wa...
See More