Spectrum Fertilizer Plant Demolition

Location

Winter Haven, Fl

Scope of Work

Demolition, asbestos abatement and removal of 500,000 SF fertilizer plant. This project consisted of complete demolition of all 6 steel constructed fertilizer manufacturing and storage structures at the Spectrum fertilizer plant. The main storage building was 80 feet tall and the entire exterior paneling was made of asbestos transite panels which had to be removed by hand wrapped in plastic sheeting and then properly disposed of.

Customer

Benge Development